INSTALLATION GUIDE
Flush-line (D) R1 02+ R6 03+ FZ1 FZ6
-1 REMOVE THE STOCK OEM
TURN SIGNAL
-1 RETIRER LES CLIGNOTANTS
-2 REMOVE THE SCREW ON THE FLUSH-LINE RIM AND
DROP THE FLUSH- LINE IN THE OEM HOLE
-2
RETIRER LA VIS SUR LE CLIGNOTANT FLUSH-LINE RIM ET DÉPOSEZ LE DANS
L’EMPLACEMENT D’ORIGINE.
-3 SCREW THE FLUSH-LINE FROM THE INSIDE PANEL
THE LOCK THE SIGNAL IN PLACE
-3 VISEZ LE CLIGNOTANT PAR
L’INTÉRIEUR DU PANNEAU POUR LE BARRER EN PLACE
-4 CONNECT THE WIRE, BLACK GROUND / GREY
RUNNING / YELLOW POSITIVE.
-4 BRANCHER LE CLIGNOTANT,
NOIR EST LE NEUTRE / GRIS LUMIÈRE DE POSITION / JAUNE POSITIF
Copyright 2008-09 Rack in
Motion
|